The pure flowshop scheduling problem is here investigated from a perspective considering the uncertainty associated with the execution of shop floor activities. Being the flowshop problem is NP complete, a large number of heuristic algorithms have been proposed in literature to determine an optimal solution. Unfortunately, these algorithms usually assume a simplifying hypothesis: the problem data are assumed as deterministic, i.e. job processing times and the due dates are expressed through a unique value, which does not reflect the real process variability. For this reason, some authors have recently proposed the use of a fuzzy set theory to model the uncertainty in scheduling problems. In this paper, a proper genetic algorithm has been developed for solving the fuzzy flowshop scheduling problem. The optimisation involves two different objectives: the completion time minimisation and the due date fulfilment; both the single and multi-objective configurations have been considered. A new ranking criterion has been proposed and its performance has been tested through a set of test problems. A numerical analysis confirms the efficiency of the proposed optimisation procedure.

An evolutionary algorithm for pure fuzzy flowshop scheduling problems

CELANO, GIOVANNI;COSTA, ANTONIO;FICHERA, Sergio
2003-01-01

Abstract

The pure flowshop scheduling problem is here investigated from a perspective considering the uncertainty associated with the execution of shop floor activities. Being the flowshop problem is NP complete, a large number of heuristic algorithms have been proposed in literature to determine an optimal solution. Unfortunately, these algorithms usually assume a simplifying hypothesis: the problem data are assumed as deterministic, i.e. job processing times and the due dates are expressed through a unique value, which does not reflect the real process variability. For this reason, some authors have recently proposed the use of a fuzzy set theory to model the uncertainty in scheduling problems. In this paper, a proper genetic algorithm has been developed for solving the fuzzy flowshop scheduling problem. The optimisation involves two different objectives: the completion time minimisation and the due date fulfilment; both the single and multi-objective configurations have been considered. A new ranking criterion has been proposed and its performance has been tested through a set of test problems. A numerical analysis confirms the efficiency of the proposed optimisation procedure.
2003
Flowshop with buffers; Fuzzy scheduling,; Optimisation algorithms
File in questo prodotto:
File Dimensione Formato  
2003_IJUFK_fuzzyFS.pdf

solo gestori archivio

Tipologia: Documento in Post-print
Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 328.36 kB
Formato Unknown
328.36 kB Unknown   Visualizza/Apri
2003_IJUFKfuzzyFS.pdf

solo gestori archivio

Tipologia: Versione Editoriale (PDF)
Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 403.38 kB
Formato Adobe PDF
403.38 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11769/1824
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 33
  • ???jsp.display-item.citation.isi??? 27
social impact