The Italian motorway and railway networks were built about 30 lo 40 years ago; they have a large number of prestressed concrete bridges and viaducts, most of these bridges must now be rehabilitated.
Methods for Extending Life of Existing Bridges: A Case Study
Nino Spinella;
2012-01-01
Abstract
The Italian motorway and railway networks were built about 30 lo 40 years ago; they have a large number of prestressed concrete bridges and viaducts, most of these bridges must now be rehabilitated.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.