Sfoglia per Autore  

Opzioni
Mostrati risultati da 21 a 40 di 163
Titolo Data di pubblicazione Autore(i) File
Statistical Process Control for a cogeneration power plant 1-gen-2001 Celano, Giovanni; Fichera, Alberto; Fichera, Sergio; Pagano, Arturo file da validare
A modified simulated annealing algorithm for statistical process control 1-gen-2001 Celano, Giovanni; Costa, Antonio; Fichera, Sergio file da validare
Fuzzy scheduling of a flexible assembly line through evolutionary algorithms 1-gen-2001 Costa, Antonio; Celano, Giovanni; Fichera, Sergio
Design optimisation of an industrial roll forming process through an heuristic algorithm 1-gen-2001 Celano, Giovanni; Fichera, Sergio; Fratini, L; Micari, F. file da validare
Application of AI techniques for the optimal design of multi-pass cold drawing processes 1-gen-2001 Celano, Giovanni; Fichera, Sergio; Fratini, L; Micari, F.
An integrated optimization tool for flow shop scheduling 1-gen-2002 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
An integrated tool for balancing and sequencing of assembly lines 1-gen-2002 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
Design of the tube roll forming process through an heuristic algorithm 1-gen-2002 Celano, Giovanni; Costa, Antonio; Fichera, Sergio; Fratini, L.
Application of statistical process control to continuous processes 1-gen-2002 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
An object oriented model for scheduling in agile manufacturing 1-gen-2002 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
Constrained scheduling of jobs with different due dates in a flowshop 1-gen-2002 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
An intelligent tool for the selection of parameters in multi pass drilling operations 1-gen-2003 Celano, Giovanni; Costa, Antonio; DI SALVO, G; Fichera, Sergio
Scheduling of unrelated parallel manufacturing cells with human resources 1-gen-2003 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
On selecting adaptive parameters in dynamic X control charts for finite production runs 1-gen-2003 Celano, Giovanni; Colosimo, B. M.; Fichera, Sergio file da validare
A comparative analysis of sequencing heuristics for solving the Toyota Goal Chasing problem 1-gen-2003 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
An evolutionary algorithm for pure fuzzy flowshop scheduling problems 1-gen-2003 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
Process Planning in Manufacturing E-Marketplaces – The Process Planner Agent, chapter in "Designing and Evaluating Value Added Services in Manufacturing E-Market Places." 1-gen-2004 Celano, Giovanni; Costa, Antonio; Fichera, S. file da validare
Information based manufacturing: an innovative tool for technical information sharing 1-gen-2004 Celano, Giovanni; Costa, Antonio; Fichera, Sergio; G., Guglielmino file da validare
Workload balancing of a manual assembly line: a case study 1-gen-2004 Celano, Giovanni; Costa, Antonio; Fichera, Sergio; Guglielmino, G.
Optimization procedures for the economic design of one sided X Bayesian control charts 1-gen-2004 Celano, Giovanni; Costa, Antonio; Fichera, Sergio
Mostrati risultati da 21 a 40 di 163
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile