This paper deals with Flow-shop Sequence-Dependent Group Scheduling and worker assignment problem. Flow-shop allows the process of a set of families of products applying the group technology concept to reduce setup costs, lead times, and work-in-process inventory costs. The worker assignment problem deals with assigning workers to workstations considering their different abilities and learning effect. The proposed model in this paper considers different objectives. The decision problems in this cellular manufacturing system are the jobs scheduling within of own group, the group scheduling and the workers assignment to the machines. The aim of this paper is to consider a more realistic profile of heterogeneous workers introducing the learning effect in the joint group scheduling and workers assignment problem. A mathematical model and an evolutionary procedure has been developed to solve this problem. A benchmark of test cases having different numbers of machines, groups, jobs, worker skills and learning index, has been taken into account to compare the efficiency of the proposed algorithm with two well known procedures.

Heterogeneous workers with learning ability assignment in a cellular manufacturing system

FICHERA, Sergio;COSTA, ANTONIO;
2017-01-01

Abstract

This paper deals with Flow-shop Sequence-Dependent Group Scheduling and worker assignment problem. Flow-shop allows the process of a set of families of products applying the group technology concept to reduce setup costs, lead times, and work-in-process inventory costs. The worker assignment problem deals with assigning workers to workstations considering their different abilities and learning effect. The proposed model in this paper considers different objectives. The decision problems in this cellular manufacturing system are the jobs scheduling within of own group, the group scheduling and the workers assignment to the machines. The aim of this paper is to consider a more realistic profile of heterogeneous workers introducing the learning effect in the joint group scheduling and workers assignment problem. A mathematical model and an evolutionary procedure has been developed to solve this problem. A benchmark of test cases having different numbers of machines, groups, jobs, worker skills and learning index, has been taken into account to compare the efficiency of the proposed algorithm with two well known procedures.
2017
Flow-shop; Group scheduling; Workforce assignment
File in questo prodotto:
File Dimensione Formato  
IJIEC_2017_9.pdf

accesso aperto

Licenza: Creative commons
Dimensione 352.87 kB
Formato Unknown
352.87 kB Unknown Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11769/30904
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 12
  • ???jsp.display-item.citation.isi??? ND
social impact