This paper deals with the total tardiness minimization problem in a parallel machines manufacturing environment where tool change operations have to be scheduled along with jobs. The mentioned issue belongs to the family of scheduling problems under deterministic machine availability restrictions. A new model that considers the effects of the tool wear on the quality characteristics of the worked product is proposed. Since no mathematical programming-based approach has been developed by literature so far, two distinct mixed integer linear programming models, able to schedule jobs as well as tool change activities along the provided production horizon, have been devised. The former is an adaptation of a well-known model presented by the relevant literature for the single machine scheduling problem with tool changes. The latter has been specifically developed for the issue at hand. After a theoretical analysis aimed at revealing the differences between the proposed mathematical models in terms of computational complexity, an extensive experimental campaign has been fulfilled to assess performances of the proposed methods under the CPU time viewpoint. Obtained results have been statistically analyzed through a properly arranged ANOVA analysis.

Minimizing the total tardiness for the tool change scheduling problem on parallel machines

COSTA, ANTONIO;FICHERA, Sergio
2016-01-01

Abstract

This paper deals with the total tardiness minimization problem in a parallel machines manufacturing environment where tool change operations have to be scheduled along with jobs. The mentioned issue belongs to the family of scheduling problems under deterministic machine availability restrictions. A new model that considers the effects of the tool wear on the quality characteristics of the worked product is proposed. Since no mathematical programming-based approach has been developed by literature so far, two distinct mixed integer linear programming models, able to schedule jobs as well as tool change activities along the provided production horizon, have been devised. The former is an adaptation of a well-known model presented by the relevant literature for the single machine scheduling problem with tool changes. The latter has been specifically developed for the issue at hand. After a theoretical analysis aimed at revealing the differences between the proposed mathematical models in terms of computational complexity, an extensive experimental campaign has been fulfilled to assess performances of the proposed methods under the CPU time viewpoint. Obtained results have been statistically analyzed through a properly arranged ANOVA analysis.
2016
Scheduling; Parallel machines; Tool change; Total tardiness minimization; Linear programming
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11769/34326
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
social impact