Several buildings located in earthquake-prone areas were conceived according to past design guidelines and do not comply with current seismic regulations. This requires effective seismic retrofitting interventions. After the collapse of the university hall of residence of L'Aquila, Italy, in 2009, several regional authorities in other Italian cities planned surveys for seismic assessments of similar student accommodation buildings, disclosing dramatic structural deficiencies in many cases. One of these buildings concerns the student hall of residence of Messina, Italy, a confined masonry-RC building analysed in this paper. This work summarizes the theoretical conception and underlying design philosophy of the seismic retrofitting of this building (through buckling restrained braces and pre-tensioned steel ribbons), describes the pushover analysis on the original and retrofitted structure, illustrates the acceptance tests on the hysteretic dampers performed at laboratory CERISI of Messina and discusses some construction issues that have arisen up to date during the installation phases.

SEISMIC RETROFITTING OF CONFINED MASONRY-RC BUILDINGS: THE CASE STUDY OF THE UNIVERSITY HALL OF RESIDENCE IN MESSINA, ITALY

Impollonia, N
Secondo
;
2019-01-01

Abstract

Several buildings located in earthquake-prone areas were conceived according to past design guidelines and do not comply with current seismic regulations. This requires effective seismic retrofitting interventions. After the collapse of the university hall of residence of L'Aquila, Italy, in 2009, several regional authorities in other Italian cities planned surveys for seismic assessments of similar student accommodation buildings, disclosing dramatic structural deficiencies in many cases. One of these buildings concerns the student hall of residence of Messina, Italy, a confined masonry-RC building analysed in this paper. This work summarizes the theoretical conception and underlying design philosophy of the seismic retrofitting of this building (through buckling restrained braces and pre-tensioned steel ribbons), describes the pushover analysis on the original and retrofitted structure, illustrates the acceptance tests on the hysteretic dampers performed at laboratory CERISI of Messina and discusses some construction issues that have arisen up to date during the installation phases.
2019
seismic retrofit; hysteretic dampers; buckling restrained braces; pre-tensioned stainless steel ribbons; confined masonry building
File in questo prodotto:
File Dimensione Formato  
De Domenico et al. Ing Sismica 1-2019-4_marzo 2019.pdf

solo gestori archivio

Tipologia: Versione Editoriale (PDF)
Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 3.3 MB
Formato Adobe PDF
3.3 MB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11769/394373
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? 20
social impact