The latest results and the activities towards the realization of a km(3) Cherenkov neutrino detector carried Out by the NEMO Collaboration are described. The realization of a Phase-1 Project has validated all relevant technologies proposed for the realization of the km(3) detector on a test site at 2000 m depth. The realization of a new infrastructure on the candidate Capo Passero site (for Phase-2 project) will provide the possibility to test detector components at 3500 m depth. (C) 2009 Elsevier B.V. All rights reserved.
Recent results and perspectives of the NEMO project
LO PRESTI, DOMENICO;PETTA, Catia Maria Annunziata;
2009-01-01
Abstract
The latest results and the activities towards the realization of a km(3) Cherenkov neutrino detector carried Out by the NEMO Collaboration are described. The realization of a Phase-1 Project has validated all relevant technologies proposed for the realization of the km(3) detector on a test site at 2000 m depth. The realization of a new infrastructure on the candidate Capo Passero site (for Phase-2 project) will provide the possibility to test detector components at 3500 m depth. (C) 2009 Elsevier B.V. All rights reserved.File in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
Recent results and perspectives of the NEMO project.pdf
solo gestori archivio
Tipologia:
Versione Editoriale (PDF)
Licenza:
Non specificato
Dimensione
852.16 kB
Formato
Adobe PDF
|
852.16 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.