Step-up transformers are used to connect large PV plants to the utility network, their sizing being often accomplished only taking into account the PV plant peak power. However, a largely unpredictable power injection on the main grid is obtained if a too large rated power is selected, leading to grid instabilities. This may result in plant shutdowns, while requiring a remarkable reserve power to be provided by conventional generation systems. On the other hand, a too small transformer lead to the creation of a bottleneck, preventing an optimal exploitation of the solar energy. This situation becomes more complex if the introduction of an energy storage system is considered. In the present paper a design technique is proposed to optimally select the step-up transformer, either on conventional PV plants, either on PV plants with energy storage. It is based on the evaluation of initial and operating costs. Moreover, the effects of induced network instabilities are also considered. Taking into account full life costs optimal solutions have been detected according to the network power control capabilities for a 2 MW PV plant.

Sizing of step-up transformers for PV plants through a probabilistic approach

Testa A.
Primo
;
Scimone T.
Ultimo
2013-01-01

Abstract

Step-up transformers are used to connect large PV plants to the utility network, their sizing being often accomplished only taking into account the PV plant peak power. However, a largely unpredictable power injection on the main grid is obtained if a too large rated power is selected, leading to grid instabilities. This may result in plant shutdowns, while requiring a remarkable reserve power to be provided by conventional generation systems. On the other hand, a too small transformer lead to the creation of a bottleneck, preventing an optimal exploitation of the solar energy. This situation becomes more complex if the introduction of an energy storage system is considered. In the present paper a design technique is proposed to optimally select the step-up transformer, either on conventional PV plants, either on PV plants with energy storage. It is based on the evaluation of initial and operating costs. Moreover, the effects of induced network instabilities are also considered. Taking into account full life costs optimal solutions have been detected according to the network power control capabilities for a 2 MW PV plant.
2013
Energy storage; Photovoltaic power systems; Power generation; Power plants; Systems efficiency; Transformers
File in questo prodotto:
File Dimensione Formato  
Scimone_Sizing-of-Step-Up-Transformers.pdf

solo utenti autorizzati

Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 976.04 kB
Formato Adobe PDF
976.04 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.11769/738594
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? ND
social impact